This is a modification of a quilt posted on MSQC. I turned the blocks on point. The Quatrefoil Quilt: Easy Quilting Tutorial with Jenny Doan of Missouri Star Quilt Co Feb 13, 2017: I learned a new quilting word today that is actually quite common--Quatrefoil. The fabric used here grabs me whenever I dare to enter Sew Original quilt shop.
Feb 14: Started off with a horizontal quilt layout but like the on-point rendition much better for these fabrics. Oct 09, 2023: Cutting & piecing. Keep thinking about Lisa, manager at the local Dollar General. Oct 18: Finished the quilt top. Showed Lisa. She said those are her colors. Oct 20: Loaded for quilting. Oct 23: Sent Intelliquilter in for servicing. Oct 31: Intelliquilter is home again! Did overlay. Ready to longarm this quilt. Nov 01: Longarming. Nov 02: Quilted. Binding is attached and clipped. Ready for hand work. And finished in one day.
0 Comments
Feb 28, 2022: Next after Munirah's Quilt
Quilt Top #1
|
Feb 29, 2020: Polished plans for the second quilt. Decided to not do the third wall hanging using the blocks in this quilt instead. Mar 01: Got the sashing done. Two borders to go. Mar 02: Quilt top #2 is finished. Mar 03: Picked out Kaufman Foxes fabric for the backing. (A grey fox has actually been seen in my back yard several times so I figure it wanders over the hill to dairy farm too.) Aug 31: In the past week or so, I made the binding & pieced the backing. Started loading. Sep 03: Prepped the top. Loaded. Sep 04: Quilted. Sep 05: Squared. Attaching the binding. Sep 10: Binding is finished. Sep 11: Delivered the quilt to Rodney just over the hill. |
Jul 11, 2019: Greg has been working on my driveway lately. Today I met his granddaughter, Alana, who loves all things monkeys. When she saw the bananas fabric, she was hooked. I decided to go with a twister quilt using all the coordinating fabrics. Pre-ordered the layer cake expected in late September. Created the EQ7 Rendition. Ordered the fabric for the outer border & backing. Sure hope it coordinates nicely. Jul 16: Teal backing/border is here. Jul 18: Pre-washed teal backing/border. Nov 23: Alana came over to plan her quilt layout. Jan 06-07, 2020, 2020: Step 1. Jan 08-13: Working on Step 2 - cutting pinwheels. Step 2 is done. Just need to add a border and prep the backing. Jan 16: Border is on. Quilt top is finished. Jun 25: Prepping & loading. Opened a new roll of batting I ordered last December that turned out to be Warm & Natural rather than the Warm & White I ordered. Warm company promptly agreed to replace it. Jun 28: Opened the replacement batting that was covered with some sort of very hard pilling. Jun 29: Again Warm company agreed to replace the faulty batting. I hope to receive the good batting tomorrow & return the faulty batting the next day. Meanwhile, quilting is on hold. Jul 07: Some good batting arrived from Warm Company in WA (rather than NC). Jul 29: Quilted. Jul 30: Binding. Aug 04: Bound. |
Jul 11, 2019: Greg has been working on my driveway lately. Today I met his granddaughter,Talin, who loves all things owls. I ordered this & one other owls panels for her back on June 12 to round out an order of white stars on navy for 15 Stars. Jul 13: Created the EQ7 rendition. Jul 14: Ordered the fabric. Jul 17: Fabrics are here. Jul 18: Backing is pre-washed. Jul 19: Everything is pre-washed. Jul 20: Pieced. Decided not to use the 2nd panel on the back. Jul 26: Gave Talin the panel I didn't use in her quilt. Dec 30: I did some overlays from which Talin selected Kindling for her longarm pattern. Jun 22, 2020: Prepped & loaded. Jun 23: Quilting. Jun 24: Quilted. Jun 25: Make binding. Jul 24: Bound and finished. |
A Quilt for Evie -Â Morningmoon Unicorns - Pieced 01/05/2020. Quilted 06/16/2020. Bound 06/20/2020.
6/20/2020
Sep 22, 2019: What a Day!!! For 2 months now, I've know that Evie loves purple and unicorns. I learned today that is not all. She also likes Narwhals (had to look that up) and dolphins. I showed her all the purples and pinks I had. One she definitely DID NOT like. One fabric, when she saw it, lit her up like a Christmas tree--the purple dogwood batik I bought for the coverlet quilts. Sumira will help her select exactly what she wants. She said, with no prompting at all ... put a unicorn in the middle with this around it (border). Doubt that will work but perhaps as the backing for when/if she outgrows unicorns. She also told me she wants all of her favorites in the quilt (panels in memory quilt type layout). Hmmm. WIll be fun to see what this narrows down to...what she chooses. I'll be making renditions of all of these to show her & see what shakes out. Sep 25: Received her selection. Sep 26: Ordered the kit. Backing is my selection. Oct 02: The fabrics are all here. Dec 03: I have decided to try to make this & Blakley's quilts by Christmas. Dec 05: Pre-washed fabrics along with Blakley's. Dec 15: Ready to start. Got familiar with the instructions & fabrics...what goes where. Separated the panels. Dec 16: Decided to Best Press the panel fabrics before cutting (9.5"x11"). Helped a lot. 16 panels are ready to sew. Dec 17: The backing is ready. I fused the Pellon SF101 100% cotton interfacing to the rayon. It did nicely. No longer too slinky to quilt. Dec 18: Adding frames to panels. Dec 19: All panels are framed. Cut the rest of the fabric into squares, triangles & rectangles that will compose the sashing. Dec 25: Still working with 68 sets of small triangles working them into squares. Dec 31: No more triangles. Now squares. Jan 02-03: Piecing the rows. Jan 04: Combined the rows & sashing. Center is done. Made the complex borders. Will attach tomorrow. Jan 05: Borders are on. Quilt top is finished. Jun 15: Prepped & loaded. Started quilting. Jun 16: Quilted. Binding is attached & ready for hand work. Jun 20: Bound & finished. |
A Quilt for Blakley - Sea Cottage - Pieced 12/15/2019. Quilted 05/10/2020. Bound 05/19/2020.
5/19/2020
Sep 22, 2019: What a Day!!! I asked Blakley to think about something that made her feel peaceful, happy, safe...something along that line. She came back after thinking about and asked for beach fabrics because of the way the beach makes her feel. At once, I thought of the Sea Cottage fabrics I had left from Dad's Gift to Caroline. She loved them. I showed all sorts of ways we could use the fabric. After looking at all them, she had me go back to Easy Peasy Disappearing Nine Patch Quilt. I can do a rendition in no time when I get a moment after my deadlines this month. Sep 24: I found some fabric and posted it on the dot screen. Sep 25: Blakley emailed me complete with pictures. "Hi, this is Blakley. I have picked out a couple quilt squares that I like on e-quilter. Can you incorporate these in to the quilt with the color square we talked about when you were here(the first picture in the email). Also can you make the backing the first the beach is my happy place for my backing (second picture in the email) please? Thank you so much! Blakley Mathieson Yes, I can...almost. The peebles fabric is sold out. It didn't look so good anyway. I am showing several options here that I think look awesome. Sep 26: Fabric is ordered. At Samira's insistence that it is what Blakley wants, the backing will be 6 panels. I ordered some of the seashore mix. The peebles sold out from under us. If Blakley really wants them, I can get a yard on eBay with an inflated shipping cost. Oct 02: All the fabrics are here. Well, almost. The vendor sent me the wrong fabric--no footprints. I have re-ordered. Oct 03: The panel came in. In fact 6 panels came in because Samira knew Blakley wanted only panels on the back. Turns out she did not want that at all. Panels, anyone? This quilt is going to be so gorgeous, so special, if I do say so myself. I love it. In fact, I have some fabric I am going to use to make the same Easy Peasy quilt. Oct 12: Replacement Footprints in the Sand fabric finally got here. Dec 03: I have decided to try to make this & Evie's quilt by Christmas. Dec 05: Pre-washing new fabrics. Sea Cottage fabrics are already pre-washed. Dec 06: Made the backing - a quilt in itself. Dec 08: Sea Cottage blocks are ready to sew. Planning the layout. Had to size down to 8" blocks from 9" blocks so more blocks needed. Dec 09: Planning the layout. Dec 10: Layout is planned. Made the 1st nine patch. Dec 11: Will cut & resew 1st nine-patch before making other nine patches then proceed from there. Aligning seams for chain piecing. Dec 12: Chain piecing remaining 9-patches. Dec 13: Longarming another quilt. Intelliquilter longarm computer is down. Dec 14: Drive wheels worn out beyond repair. Ordered & waiting for new ones. Rows are together. Just need to join them to each other to finish the quilt top. Dec 15: Joining the rows. Quilt top is finished. Top & back are ready to longarm. Will do a few overlays of patterns. Turned out that the top is as soft & quiet as the back is bold & colorful. Really is 2 quilts with 2 different moods in one. Apr 28: Prepped & loaded. Quilting. May 10: Quilted. May 19: Bound. | |
15 Stars for JR Garland
May 20, 2019: Been hoping to make this quilt for awhile. Made the mistake of stopping in at the local quilt shop just to say hello. Got me thinking deeper about fabrics. Contrast to make the flag (not the borders) "wave" is the key. Jun 13: Settled on some fabrics. Wanted more contrast but this will work. Ordered Andover Stars Navy Fabric. I will piece or paper piece the stars if I can perfect it. Jun 17: The navy fabric is here so I am all set to piece when I get/make the time. Working on my star. Found a paper pieced star pattern I like. Jul 19: Pre-washed all the fabrics except red charms (5" squares). Jul 23: Asked Joan if she would be interested in doing the paper piecing. She just might. Turns out I pieced the stars Aug 01: When I offered John a quilt, he chose 15 Stars over the others I am planning: Disappearing Pinwheel, & Glory. Nov 11: Veterans Day. Been working on stars since Saturday trying to get the right dimensions. Ain't easy as the slightest change makes a huge difference. Looks like I may have enough fabric for a second quilt. Nov 13: After 5 long days & many samples, I finally have a star that I think will work nicely. Now I understand why the author of this quilt design used wonky stars but I got stubborn and want something more like the real flag. Where is Betsy Ross when you need her? My star isn't perfect but it is visually close. Nov 16: Have 16 stars cut ready to sew. Helping a friend a couple of days this week. Nov 17: Sewing one set of 16 stars together. Nov 21: Have one set of stars ready for the quilt. Nov 27: Red charms (5" squares) are ready for the quilt. Just leaves HSTs (half square triangles) & borders...then can assemble. Nov 28: Working on HSTs. Process: 2 strips 4" wide. Sew together along long sides, both sides. Use HST strip ruler to cut 5" sq HSTs along the seams alternating sides. 10 squares per strip. 4 strips per quilt. 33 blocks - 15 A blocks & 18 B blocks. All blocks are ready now to assemble. Nov 29: Working on A & B blocks. Nov 30: A & B blocks are done ready to square & then assemble into the quilt. Whew. Jan 19, 2020: Resuming work to join the blocks. Jan 20: The blocks are joined into rows. Jan 23: Joining rows into quilt center. Done. Only borders left to do. Jan 28: Started adding inner white border. Feb 03: White border is on. Cut the red & blue borders and blue backing. Need to pre-wash the blue fabric. Feb 20: All the borders are on & the quilt top is finished. Feb 21: Sampled the Modern Eccentric quilting design & love it! So does John. Mar 22: Made the backing & loaded it. Mar 23: Finished loading. Quilting. Mar 25: Quilted. Mar 26: Made & attached binding by machine. Started the hand work of stitching the binding to the back. Mar 31, 2020: Finished. |
Jan 26:I prepped & started loading Greg's quilt. When he got here, I showed Greg where the patterns were online. He selected the dragon & "On the Wild Side". I will place 5 dragons on the quilt filled in with text. I must have deleted my wild side pattern so while I was working on recreating it, Greg did most of the loading. Loaded ready to quilt once I finish the programming.
Jan 27: Programmed. Quilting in sections - a total of 22. Two rows (8 sections) are done. Waited for Greg to see before rolling.
Jan 28: Quilted. Made a black binding. Attaching it.
Jan 29: Hand binding...
Jan 30: T-shirt ordered.
Feb 01: Bound.
Making this quilt for Alicia Miller Dec 24, 2016: Purchased 3 charm packs from Ye Olde Forest Quilt Shop during their annual stocking stuffer promotion. Nov 06, 2018: Today, my friend & very special lady, Alicia, selected this for her quilt. We've been working up to this for several months now. Can't wait to get started. Nov 07: Working on a rendition. Nov 08: Ordered fabric for background, borders, binding & backing. Nov 13: All fabrics are here. Jul 03: 2019: Started working with the charm packs (2). Jul 04: Cutting background charms, i.e. 5" squares. Jul 06: Arranged the blocks. Jul 09: Sewing the blocks. Jul 12: The blocks are done. Next cut, swap, sew back together into final blocks. Jul 15: I intentionally cut the background square a tad too big so I trimmed the blocks. Cutting 1" from the center all the way around, swapping corners & turning the center square to get the final layout, then sewing the 9 pieces back together into the final block. MSQC video Sep 06: Resumed piecing. Sep 07: The center is done. Sep 08: First border is on. Widening the outer border from 3" to 6". Sep 10: Backing, outer border & binding are cut and ready to sew. Sep 11: Bought the Paper Dolls pattern by Vicki Malaski. Quilt top is finished. Nov 30: Loaded & quilting. Dec 01: Quilted. Dec 02: Binding is attached ready for hand work. Jan 01, 2020: Bound. |
Ivory Dogwood Batik Custom Quilt - Pieced 10/31/2019. Quilted 11/02/2019. Bound 11/06/2019.
11/6/2019
Fascinating Documentary: How Bali Batiks are Made Aug 02, 2019: The fabric for the Ivory Dogwood quilts is here. I'll be making a rather large quilt using custom blocks but arranged like a whole cloth pattern. The borders will be traditional custom. Aug 03: The print is so much larger than I expected that I am trying to get a feel for how the quilting might look. First task--pre-wash...tomorrow. May take several tomorrows ... lol Aug 04: The lights are washed & ready to cut. Aug 05: The darks are washed, not dried or pressed. Aug 06: Working on partly custom, mostly whole cloth layout. It will be awhile before a final plan emerges. Ideas are floating out there on the "dot" screen; if you know what that is, feel free to take a peek. I've been having an unusual number of "unforeseen circumstances", all good, but hard to get anything I planned done. Good thing too. Just learned my quilt recipient is enduring "unforeseen circumstances" too. So this is on hold. Aug 09: The last few days, I finished the washing, drying, pressing & folding all the fabrics--a good pause point. I have decided we all need to leave this alone for a while, me too. The parameters & options & decisions & life are conflicting--solve one question, three pop up in its place. There is no urgency here. Sep 09: Took some time to revisit the custom designs. Oct 15: Started piecing. The center needs to pieced to be large enough. After attaching the side piece, I decided to split it with a smaller section on each side of the center. Oct 16: Too sick to work. Oct 17: Quilt top is done. Backing is ready. Will load tomorrow. Oct 19: Loaded ready to quilt the top two borders. Oct 20: Quilting. Did top two borders & 5 rows before I discovered the serious tensions issues. I know to check like crazy when starting a new quilt but just didn't check this one. Didn't photograph any more because the quilting just doesn't show--only when lights are dimmed. Oct 22: Starting over. Too much to take out. Ordered new fabric. Oct 25: New fabric is here. Oct 29: Pre-washing is done. Oct 31: Quilt top is pieced ready to load. I am abandoning custom quilting & have modified Donna Kleinke's dogwood pantograph slightly. I have sized the pantograph to fit nicely on the borders. Nov 01: Loaded. Nov 02: Quilting. Quilted. Nov 03: Binding is attached & ready for handwork. Nov 05: Finished 3 of 4 sides. Best time ever. Good thing since I need to reload & fix an area that didn't get quilted. Plan to deliver Thursday afternoon. Nov 06: Finished. |
Aug 22: Received initial specs for a design for another costume. Aug 23-28: Speced & programmed. Will be doing four 90" wide panels. Aug 29: Fabric & polyester batting is on the way. Sep 05: Everything is here. Sep 12: Did a sample to help select thread. Oct 04: Prepping. Oct 05: Loading first panel of 4 then quilting. Repeat. Repeat. Repeat. Oct 06: Two done & packed up to ship. Two to go. Oct 07: Three done. Oct 08: All done now. Off to the post office Must say it has been delightful working with Jay this year. Wishing the opera every success. Linda Lovett |
Aug 02, 2019: The fabric for the Ivory Dogwood quilts is here. I will be making two, perhaps 3. Aug 03: The print is so much larger than I expected that I am trying to get a feel for how the quilting might look. First task--pre-wash...tomorrow. May take several tomorrows ... lol Aug 04: The lights are washed.& ready to cut. Aug 05: The darks are washed, not dried or pressed. Aug 06: Working on partly custom, mostly whole cloth layout for the 2nd quilt. It will be awhile before a final plan emerges. I've been having an unusual number of "unforeseen circumstances", all good, but hard to get anything I planned done. Good thing too. Just learned my quilt recipients are enduring "unforeseen circumstances" too. Aug 09: The last few days, I finished the washing, drying, pressing & folding all the fabrics--a good pause point. I have decided we all need to leave this alone for a while, me too. The parameters & options & decisions & life are conflicting--solve one question, three pop up in its place. There is no urgency here. Aug 30: Pieced ready to quilt. Aug 31: Backing is prepped ready to load. Sep 01: Loaded. Quilting. Sep 02: Quilted. Sep 04: Bound. |
Mar 06: Second round of conversations.
Aug 20: Finally asked--the opera is The Marriage of Figaro by Mozart.. How kool is that?!!!
Sample 1
Apr 03: I received the first full design. Apr 06: Did a sample with Bottom Line thread & a double layer Quilters Dream Wool batting. Quilted a Karlee Porter Fleur de Lis for the top section & used Donna Kleinke's Garden Bunnies Border 3 for the bottom. Apr 24: Heard from Jai after a meeting with the designers. Galen came on board to assist Jai. They liked the thread and batting. May 17: SFOpera bought a bolt of wool batting. They would find someone from the list of pantograph designer to draw the quilting design. |
Sample 2
Jun 27: Heard from Todd Brown of Legacy Quilting who will be doing the quilting design. Jul 20: Todd sent me his design to test on my Intelliquilter. Jul 22: Talked fabric with Jai. He will ship the fabric later this week. Aug 09: Told Jai I found the small remnants perfect for testing the fabric and design. I also said I was ready to start. The gremlins around here must have been laughing, "Oh yeah?" Aug 13: Got the sample loaded. Doing a final tweaking on Todd's design so it will sew nicely on my machine. Aug 14: Still doing this time intensive work, exactly the kind this retired programmer loves to do. I only come up for air (take a break) when the battery low warning shows up. Seen that 3 times so far. Aug 15: Finally had to plug in the computer so I could keep working without interruptions. Discovered a goof in the specs. Got it sorted and plugging away getting ready to do the sample. Will then take a break waiting on more material. Aug 16: Catching up here. Ready to quilt. Sample is done. Learned a lot so very worthwhile. Aug 21: SFOpera has used the sample to prompt a few layout changes. They want the design shorter. They are sending the top fabric on a roll to get rid of the fading along the fold line. Oh, and another design for another costume/show similar this one--the reward for a job well done is more work, no? |
The Real Costume
WoW - Stands for Will O'Wisp, the quilt pattern from Not Your Grandmother's Log Cabin book.
This is my second one. It really is a log cabin quilt but with 60 instead of 90 degree angles.
Progress Maps
Piecing
Apr 13, 2017: Met with Crystal this morning to get an idea of what she might like. It will be fun to see where we end up. The WoW from 2011 wowed her instantly. I pulled the greens and purples from my batiks collection & will plug them into the EQ7 rendition to see how it looks & what it might need. Also have other fabrics on hand that might do. Not getting anywhere... Apr 18: Went to Greensboro. Picked up 7.5 yds of purple & green batiks with Joanne's help. Apr 24: Met with Crystal & showed her several options for using the fabrics. She still wants Will O' Wisp & loves the brighter colors. Apr 05, 2018: After a year's delay, I am finally taking the time to work on this quilt. I prepped the fabrics for cutting and then spent time re-familiarizing myself with the details of how to layout the fabrics. Also made a cutting chart to help keep things straight. Ready to start cutting tomorrow. Apr 06: The strips that make up the main part of the quilt are cut. Apr 07: Chimneys (dark blue) are cut. Logs from 7 of the 8 fabrics are cut. Apr 08: All pieces are cut ready to sew. Apr 15: Made A blocks which comprise the center star. Apr 17: Working on B blocks. Everytime I start to sew for the last 2 days, I get interrupted. Apr 18: Thought I finished B blocks only to discover I had pieced mirror images of what I intended. These just happen to be Br blocks. I need two more Br blocks. I can make the correct 6 B blocks from the Br logs. If one is going to make a major mistake on this quilt, this is the one to make. B & Br blocks are done. May 26: Been working on the 22 D blocks as I have a few minutes. Done now. Aug 13-15: Have a bit of time so working on C blocks. Dec 16: Continuing the work on C Block. Dec 18: C Blocks are done. 6 wedges & 4 corner sections are done. Dec 27: The center is in one piece. Only border are left to do. Dec 28: Borders are on & thus the quilt top is finished. |
Longarming & Binding
Dec 29: Saw Crystal today. She selected Zephyr for her pattern. Posted overlay. Jun 21, 2019: Prepping and loading. After 2 years, it's about time to finish this up. Jun 22: Loaded. Got sick all of a sudden. Jun 23: Quilting. Love the pattern Crystal picked on this quilt. Forgot to take picture on first row (Still feeling queasy.) Jun 24: Quilted. Squared in preparation for the binding Jul 03: Cut binding strips - first task after 2019 Work Area Upgrade Jul 09: Made the binding. Jul 21: Attached the binding and started the handwork. Got about 1/2 way. Jul 29: Finished the binding & thus the quilt. Jul 30: Pressed & packaged the quilt. Figured I'd better call before heading out to deliver this. Darn, she's not working today. Tomorrow I'll enjoy breakfast when I deliver this. Jul 31: Hand delivered. I rarely go for breakfast but it was excellent. |
The Quatrefoil Quilt: Easy Quilting Tutorial with Jenny Doan of Missouri Star Quilt Co
Feb 09, 2018: The only thing I have to go on is "yellow". Stopped by the quilt shop on the way home from talking to Mish at Geeks at Work & reserved these fabrics.Over the weekend, I posted lots of renditions. Feb 12: Since no requested feedback, I made an executive decision to make this quilt. I like that there are two contrasting Quatrefoil designs--the blue & the yellow. Bought the fabric. Feb 14: Busy working on another project that is on hold until Friday so I am cutting strips. All cut except the yellow. Feb 15: Everything except backing is cut & ready to sew. Feb 16: Sewed the strip sets & cut into pieces for making the 4-patches. Feb 17: Started on the 4-patches. Feb 18: Finished the 4-patches. Started on the blue leaves of the quatrefoil attaching the yellow squares to the corners on one side. Feb 19: Finished making the quatrefoil leaves. Just a matter joining the top 3, middle 3 & bottom 3 blocks into the larger 12" quatrefoil blocks. The middle ones with the large colorful squares are done. Feb 20: Working on the blocks. Feb 21: Top & bottom rows are done. Connecting top & middle rows. Feb 22: The blocks are done. Next connecting them into rows. Feb 27: Been working but slowly. Finished putting the rows together. Whew! Feb 28: The quilt center is done. Pressing and borders tomorrow. Mar 01: Working on borders. Finished 2 of 3. Mar 04: Third border is on which will mean this baby is pieced. May 03: Somewhere along the line I made the binding. Piecing the backing. Aug 30: Took my quilt to Sew Original to show Patti who helped me select the fabrics way back when. I had purple fabric intended for this quilt but it never quite felt right. I decided to replace it with Grunge Sky Blue, a perfect match to the blue used throughout the top. And it will show the quilting. Since Mish is into robotics, I choose Steam Punk Gears for his panto and will quilt it as loose as I can. Thinking Light Yellow thread. May try for blue in the bobbins. Sep 13: Mish likes the gears (over the Spokes I also have). May 28, 2019: Prepped. Loaded ready to quilt. May 29: Quilting. Quilted. May 30: Squared the quilt. Attached the binding. Jun 11: Binding is finished. Jun 12: Delivered in person. What a smile, Mish. |
May 05, 2019: A special couple has just commissioned this fun little quilt. This is an enlarged version of the original made in 2015. Someone is living right because to be able to find the same fabrics 4 years later is rare ... and I know who they are! (When I first learned they were in the market for a quilt, I sold them on Joan's beautiful Gold Quilt, my heart throb since I did the binding on it back 2016. They still wanted one made by me so this will be it. May 06: Ordered fabric from Nuts and Bolts Fabric & AceHardwareMerc. I must say the ladies behind these shops have the best customer service I have experienced. Thank you Earleen & Jenn. May 09: Fabrics are here. At the end of an aggravating day of longarming, I decided to go ahead and cut the charm pack in pieces for making the braids. May 11: Planning the braids. May 12: Sewing the braids. This is so much fun & fast. No fussy points yet looks tedious. Didn't start sewing until after 8 PM and got halfway in an hour. May 15: Finished the braids. Cut the sashing and borders. May 27: Trimmed the braids. Added the sashing. May 28: Added borders. Quilt top is pieced. Backing is ready. May 30: Programmed. Loaded. Quilted. May 31: Made the binding. Jun 01: Binding is attached. Ready for hand work. Jun 04: Started hand work. Jun 07: Binding is finished & thus the quilt is finished. Jun 10: Delivered in person. |
Dec 24, 2018: Around noon, I got an email from Craig Evans about my UNC Tarheels Quilt. This is a slightly modified version enlarged to king size. Dec 26: Plan is finalized, fabric is ordered. Dec 29: The flannel backing is here & it is awesome. Jan 02, 2019: All the rest of the fabrics are here. Jan 03: Pre-washed the white fabric. Jan 07: Proposed lettering quilting patterns. Jan 17: Returning Blueberry fabric that worked on previous quilt because the feature fabric had some light blue but not so good for this one. Using me new Kona color card, I ordered Prairie Sky in its place. Feb 01: Now know exactly how much background fabric I need before pre-washing. Feb 02: Fabrics are washed ready to cut. Feb 04: Working on the background blocks. Feb 16: Background squares are trimmed. Feb 17: Strips cut for windows & borders. Starting on window blocks. Feb 18: Making progress on the window blocks. Short a strip of Prairie Sky fabric because there were flaws in what I received. MSQC is sending enough replacement fabric for me to finish. Feb 19: Finished the blocks. Feb 23: Carolina flannel backing & navy borders & sashing are pre-washed. Feb 24: Started on the sashing. Made the binding. Feb 25: Rows are mostly done. Feb 27: Half of the quilt center is in one piece. Still waiting for 3.5" of light blue fabric. Mar 01: The last bit of fabric is here now. Mar 08: The last 3 blocks are ready to insert into the quilt top. Mar 11: Organized sashing & border strips. Mar 13: Sashing & borders. Mar 17: The quilt top is in one piece. Only borders left. Mar 20: Sashing is finished. Working on white border. Mar 23: White border done. Apr 04: Change of plans. Going to do custom stitch in the ditch quilting of this one. Apr 10: Quilt top is finished. Apr 30: Got the main backing done. May 01: Leaders added to make the backing large enough to load. May 02: Loading. May 03: Loaded. May 07: Quilting. May 09: After quilting many rows without a hitch, I suddenly had a thread/tension problem yesterday. Resolved it this morning. Should finish quilting today. NOPE. It is one of those nightmare after nightmare days. May 10: Quilted. All is well that ends well. May 15: Squared the quilt in preparation for binding. May 21: Binding is attached. May 22: Clipped the binding and started the hand work. May 24: Binding is done thus the quilt is done. Jun 10: Shipped. Craig has been out of town. |
Categories
All
1 Planned Projects
1 Quilts In Progress
2007 Tis Of Thee
2008 - 2010 Mine
2011 - 2013 Mine
2014 - 2015 Mine
2016 - 2018 Mine
2019 Forward Mine
9 Misc
Abby
Ada Blackwell
Adora Avaltroni
Amy Newton
Amy Quilts
Andrea Guidi
Asiyah Kurtz
Bags--Birdie Sling
Bandana Quilts
Barbara Berry
Barbara Johnson
Becky Keith
Becky McCree
Beth Berry
Blanca
Brent Murphy
Bryn Meehan
Buddy Linson
Caci Kostik
Callie Birdsell
Carin Jackson
Carole Landry
Carol Henig
Carrie Byrd
Cathy Fox
Celia Gwaltney
CG
Chuppahs
Cindy Baur
Cindy Dodd
Cindy Hoy
Clayton
Craig Evans
Cynthia Latham
Debbie Hauser
Debra Smith
Dee Edwards
Denise Moore
Diana Trivette
Diane Holland
Dionne Latham
Dona Fox
Donna Roberson
Dorothy Wonder
Drew Quinton
Dyann
Eleanor
Elizabeth Claverie
Elizabeth Wordell
Eliz Goodridge
Erin McGuire
Frances Hunt
* FYI
Gabriela Tesh
Gail Burton
Gail Calcutt
Ginger Moore
Gislaine
Gomez Family
Grace
Heather Murphy
Heidi
Honey Bees
Jackie K
Jane Duncan
Janet Murphy
Janet Waln
Jannie Preddy
Jen Froio
Jennifer Henry
Jipco Herzog
* J&L Quilts
Joan Taylor
Joan Taylor Rwb
JR Garland
Judi Whittaker
Julianna
Karen Gulliford
Karen Kandl
Karen Makoul
Karyn Tageson
Kathy Boynton
Kathy Millbrand
Kelly Bohne
Kim In TX
Kit Newlin
Kristen
Kristin Minnick
Kyle Berkley
Lake Polan
Laura Luke
Laura M
Laurel Kendrick
L.D. Quilts
Leigh Kulish
Linda Campbell
Linda Licht
Lisa Lavitski
Loretta Bell
Lorraine Neill
Love Your Melon
Lu Ann
LW Quilts
Madeline Ditzler
Mandy Franklin
Maria W
Marilyn P
Marsha Ellison
Mary Blankenship
Mary Bucy
M Avery
McNeil Family
Melissa Kogler
Melodee Zamudio
Michael Elinski
Michelle Binder
Misty Mealey
Molly Barry
Munirah & Family
Nancy Goehring
Nancy Gorgen
Nancy Krantz
Nina Stoma
Nita Powers
Oma Heidi
Pat Byerly
Patricia Cone
Patricia Ferrari
Pattie Glennon
Paula Ginn
Petra Fauerbach
Piper
Rare Bear Pgm
Rebecca Leonard
Roberta Jackson
Roberta Patzer
Robin Tuttle
Rodie's Parkway Grill
Rozie Bolac
Rudy Projects
Sandra Hagler
Sandy Peter
Sandy Reavis
Sarah Holden
Sara Serio
SF Opera
Sharon Grassini
Sharon Stoehr
Sonya Gingerich
Sonya Green
Staci Gilbert
Stephanie Germack
Susan Stann
Sylvia Cox
Tara Hemami
Terrie McCoy
Terry Lubin
Terry Rouch
Tracy Edwards
Transplant Children
Trivette Family
Vicki B
Wilhelmina G
Wilma Snell
YOFQ
Z_History
Archives
November 2023
October 2023
July 2023
September 2022
May 2022
July 2021
January 2021
November 2020
October 2020
September 2020
August 2020
July 2020
June 2020
May 2020
April 2020
March 2020
February 2020
January 2020
December 2019
November 2019
October 2019
September 2019
August 2019
July 2019
June 2019
May 2019
April 2019
March 2019
February 2019
January 2019
December 2018
November 2018
October 2018
September 2018
August 2018
June 2018
May 2018
April 2018
March 2018
February 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
June 2017
May 2017
April 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
January 2015
December 2014
November 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
February 2014
January 2014
December 2013
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
December 2012
November 2012
October 2012
September 2012
August 2012
July 2012
June 2012
May 2012
April 2012
March 2012
February 2012
January 2012
December 2011
November 2011
October 2011
September 2011
August 2011
July 2011
June 2011
May 2011
April 2011
March 2011
February 2011
January 2011
December 2010
November 2010
October 2010
September 2010
August 2010
June 2010
May 2010
April 2010
January 2010
September 2009
November 2008
August 2008
July 2007